Review Documents - CCSDS 320.0-P-6.1

REQUEST FOR REVIEW OF CCSDS DOCUMENT

Distribution: Online (note 1)
Review begins: See "Review Dates and Coordinator" Section Below Review ends: See "Review Dates and Coordinator" Section Below (note 2)

The Management Council of the Consultative Committee for Space Data Systems (CCSDS) has authorized the publication, and requests Agency review, of the following document:

CCSDS Spacecraft Identification Field Code Assignment Control Procedures
Draft Recommended Practice
CCSDS 320.0-P-6.1 (Pink Book) Issue 6.1 November 2016

DOCUMENTS:

DOCUMENT DESCRIPTION:

This Recommended Standard defines the procedures governing assignment, relinquishment, and management of CCSDS Spacecraft Identification (SCID) codes. The current draft update adds frequency band as a qualifier for SCID assignment, names the SCID qualified by version number and frequency band the Qualified SCID (Q-SCID), and replaces the outdated hard-copy request form with instruction to use the online form on the Space Assigned Numbers Authority (SANA) Web site.

REVIEW INSTRUCTIONS FOR REVIEWERS:

The HTML RID form provided at the link below is for submitting your review comments. You may enter as many RIDs as needed. Contact the Secretariat office at secretariat@mailman.ccsds.org if you have questions.


REVIEW DATES AND COORDINATORS:

International review start date: 11/9/2016
International review completion date: 1/31/2017
Overall review coordinator:
Name: Peter Shames
E-mail: Peter.M.Shames@jpl.nasa.gov

NASA review start date: 11/9/2016
NASA review completion date: 1/24/2017
NASA review coordinator:
Name: Peter Shames
E-mail: Peter.M.Shames@jpl.nasa.gov

JPL review start date: 11/9/2016
JPL review completion date: 1/17/2017
JPL review coordinator:
Name: Peter Shames
E-mail: Peter.M.Shames@jpl.nasa.gov

GSFC review start date: 11/9/2016
GSFC review completion date: 1/17/2017
GSFC review coordinator:
Name: Dan Smith
E-mail: Danford.S.Smith@nasa.gov

MSFC review start date: 11/9/2016
MSFC review completion date: 1/17/2017
MSFC review coordinator:
Name: Tom Wickline
E-mail: Thomas.W.Wickline@nasa.gov

JSC review start date: 11/9/2016
JSC review completion date: 1/17/2017
JSC review coordinator:
Name: Raymond Wagner
E-mail: raymond.s.wagner@nasa.gov

GRC review start date: 11/9/2016
GRC review completion date: 1/17/2017
GRC review coordinator:
Name: Sandy Johnson
E-mail: sandra.k.johnson@nasa.gov

U.S. Associate review start date: 11/9/2016
U.S. Associate review completion date: 1/24/2017
U.S. Associate review coordinator:
NASA Head of Delegation to CCSDS
NASA Headquarters
Washington, DC 20546, USA
E-mail: secretariat@mailman.ccsds.org


Note 1: Per resolution MC-S97-22 of the CCSDS Management Council (May 1997), the Secretariat no longer makes routine hardcopy distribution of draft CCSDS Recommendations. Instead, electronic copies are made available on line. Camera-ready copies of draft Recommendations for local reproduction may be requested from the Secretariat.
Note 2: Agency comments should be received by the review coordinator on or before the "Review ends" date. Document managers should schedule an agency review period that allows time for receipt of reviewer comments and formulation of an agency position prior to the end date.
Copyright 2020 © CCSDS/ASRC Federal Technical Services All rights reserved.