REQUEST FOR REVIEW OF CCSDS DOCUMENT

Distribution: Online (note 1)
Review begins: See "Review Dates and Coordinator" Section Below Review ends: See "Review Dates and Coordinator" Section Below (note 2)

Draft documents are subject to change, and the draft CCSDS Recommendation referenced here does not necessarily represent consensus technical agreement among the CCSDS Member Agencies.

The Management Council of the Consultative Committee for Space Data Systems (CCSDS) has authorized the publication, and requests Agency review, of the following document:

Flexible Advanced Coding and Modulation Scheme for High Rate Telemetry Applications
Draft Recommended Standard
CCSDS 131.2-P-1.1 (Pink Sheets) Issue 1.1 August 2021

DOCUMENTS:

DOCUMENT DESCRIPTION:

This Recommended Standard defines a Serially Concatenated Convolutional turbo Coding (SCCC) scheme for telemetry applications. The current draft update adds support for the Unified Space Data Link Protocol.

REVIEW INSTRUCTIONS FOR REVIEWERS:

Member and Observer Agencies are requested to send their sets of review comments to the CCSDS Review Coordinator with a copy to the CCSDS Secretariat. Each review comment should be submitted on a separate Review Item Disposition (RID) form. Submission of RIDs in electronic form is preferred. The following ASCII RID forms are available (click on form name to access):

Please contact the Secretariat office at secretariat@mailman.ccsds.org if you have questions.


REVIEW DATES AND COORDINATOR:

International review start date: 8/9/2021
International review completion date: 10/8/2021
CCSDS Review Coordinator:
Name: Andrea Modenini
E-mail: Andrea.Modenini@esa.int

Note 1: Per resolution MC-S97-22 of the CCSDS Management Council (May 1997), the Secretariat no longer makes routine hardcopy distribution of draft CCSDS Recommendations. Instead, electronic copies are made available on line. Camera-ready copies of draft Recommendations for local reproduction may be requested from the Secretariat.
Note 2: Agency comments should be received by the review coordinator on or before the "Review ends" date. Document managers should schedule an agency review period that allows time for receipt of reviewer comments and formulation of an agency position prior to the end date.